View Properties

PCB 72-297 10/10/72 Opinion
ILLINOIS POWER CO. (HENNEPIN STATION) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-38343
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 3, 2003 02:14:33 PM CST
Thursday, April 10, 2003 08:20:46 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 10, 1972ILLINOIS POWER CO.
  • The opinion observed that the company’s ability to meet the
standard by controlling only one of the two units “demonstratesthe laxity of the existing standard,” which has since beentightened with a future effective date.
  • The
company agrees to other conditions suggested by the Agency toassure that there is a real need for the use of Unit #1 byitself.
  • 3.
  • That Petitioner maximize uti:Lization of its Baldwin Unit,
flood River Gnits.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
443352
No
Appears In: PCB 72-297
Preferred Version: PCB 72-297 10/10/72 Opinion