September 26, 1972ENVIRONMENTAL PROTECTION AGENCYv.
) ~72—5O
GA? If,for any reason, the Pollution Control Board fails in anyrespect to approve the aforesaid Stipulation in Water Case,then the Stipulation and Proposal for Settlement i.n theinstant cause is null, void and of flO effect.
be perm.i~tted to operate
its plant located at Joliot, Illinois at presentemission levels until January 31, 1.973;’h.
GAP agrees to pay $15,000 to the State of I1linois~
I, Christan Moffett, Clerk of the Pollution Control Board,certify that the above Order was adoptee this 26thday ofSeptember, 1972, by a vote of CAF C...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf