  • ILLINOIS POLLUTION CONTROL BOARD
August 7, 1997COMMONWEALTH EDISON COMPANY(Zion Power Station),Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • The Board granted petitioner’s request for a
provisional variance to allow petitioner to operate its electric generating facility while itconducted treatment on the component cooling water system (CCW system).
  • The provisional
variance was to begin on a date in May 1997 when treatment of the CCW system was tobegin.
  • at 1.
  • Therefore, the parties request that the
Board vacate the order granting petitioner the provisional variance. Commonwealth Edison Co. v.IEPA (July 10, 1997), PCB 97-202.