  • ILLINOIS POLLUTION CONTROL BOARD
January 30 , 1973MARQUETTE CEMENT MANUFACTURING CO.,Petitioner,vs.
  • The program
had a capital outlay of $16.5 million of which $3.25 million wasfor air pollution control equipment.
  • The
controls were finally received by Marquette on October 30, 1972,almost two months late, This two-month delay has caused a substantial upset in Marquette’s construction schedule and is thereason for the variance request.
  • ..‘
CR.
  • In the event that kilns 1 through
8 have not been shut down as estimated on December 17 or 22,1972, Marquette shall continue in full force and effect thebon...
Allowed