  • ILLINOIS POLLUTION CONTROL BOARD
October 31, 1972MATTISON MACHINE WORKS,Petitioner,vs.
  • The delay was caused by late delivery of equipment
to Mattison by the supplier.
  • The supplier had represented to
Mattison that the system, even without the baghouse, would resultin 80 percent collection of cupola emissions.
  • ORDER
It is ordered that:1.
  • The variance granted Petitioner on February 3, 1972
is extended through December 15, 1972 or sixty daysafter final delivery to Mattison of all equipmentnecessary for installation of the cupola emissioncontrol system, whichever first occurs.
  • 6—112
—3—I, Christan L. Moffett, Clerk of the Illinois PollutionControl Board, hereby certif...