View Properties

PCB 72-321 10/24/72 Opinion and Order
INTERNATIONAL HARVESTER CO. (Wisconsin Steel Division) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-37706
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, March 25, 2003 10:13:06 AM CST
Friday, May 2, 2003 10:28:09 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 24, 1972INTERNATIONAL HARVESTER CO.
  • (R.
  • 21, 30) .
  • Between each pair of ovens, in which coal is
heated without air to drive off volatile matter, are combustion chambers in which gas is burned to provide heatfor the coking process (R.
  • 30) .
  • Our new air pollution
regulations, adopted in April of this year (4~R71—23, April13, 1972, 4 PCB 191) , impose strict requirements for thecontrol of emissions from the coke ovens themselves, themost dramatic of which (dealing with emissions while theovens are open for charging and pushing) require the installation of control equipment by December 1973 and December 1974, PCB Regs., Ch, 2, Ru...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1336190
No
Appears In: PCB 72-321
Preferred Version: PCB 72-321 10/24/72 Opinion and Order