View Properties

PCB 73-130 06/21/73 Opinion and Order
BUNGE CORPORATION v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-37482
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, March 20, 2003 02:30:48 PM CST
Tuesday, April 22, 2003 01:58:39 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 21, 1973BUNGE CORPORATION, Petitioner,vs.
  • The facility includes a dump pit, dryer,
elevator legs and a barge loading station.
  • Petitioner is installing a system to control emissions from
the truck dump, receiving and shipping legs and the transferconveyor which will be operational in late September 1973.
  • We believe that Petitioner’s request is reasonable.
  • Therefore, Petitioner will be in
compliance with the law and no variance is needed.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
282211
No
Appears In: PCB 73-130
Preferred Version: PCB 73-130 06/21/73 Opinion and Order