  • ILLINOIS POLLUTION CONTROL BOARD
June 21, 1913 )~ INC.
  • L.a the fats rise, fatty acids are released and washed
free.
  • During that time period they have done odor surveys, installed an
aeration system, put in new stainless steel sweet water storagetanks, experimented with neutralizing chemicals,’ converted coalboilers to gas, relocated cenain pieces of process equipment, performed feasibility studies, installed a screen system, and installeda skimming tank.
  • We
will, however, grant a short term variance until September 30, 1973 sothat the final design plans and schedules may be completed and submitted to the Agency.
  • I, Christan L.
  • Moffett, C...