BEFORE THE ILLINOIS POLLIJTION CONTROL BOARD Ct1~M’SMJ~R18 2003STATE OF IWNOISCITY OF AUBURN ) Pollutton Control BøardPetitioner, ) ‘v.) (Provisional Variance)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.- The pumping duration is expected to be three to five days with daily sampling of
I IflI\ jr..) ~CJt_J...) SC..inflow is 300,000 gallons per day and designed average flow of 620,000 gallons per day. The wastewater would eventu... |