View Properties

PCB 03-152,031803 PrvVar
Handle: Document-37348
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, March 18, 2003 02:15:21 PM CST
Tuesday, October 26, 2004 02:50:43 PM CDT
Modified By:
Locked By:
  • I IflI\ J.~_) ~ i~~_J.L C~S I J LJC ILIr.J I
BEFORE THE ILLINOIS POLLIJTION CONTROL BOARD Ct1~M’SMJ~R18 2003STATE OF IWNOISCITY OF AUBURN ) Pollutton Control BøardPetitioner, ) ‘v.
  • ).
  • PCBO3-/’~
) (Provisional Variance)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.
  • The pumping duration is expected to be three to five days with daily sampling of
I IflI\ jr..) ~CJt_J...) SC..
  • CIA.
  • The average daily
inflow is 300,000 gallons per day and designed average flow of 620,000 gallons per day. The wastewater would eventu...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-152,031803 PrvVar.pdf
4
844679
No
Appears In: PCB 03-152
Preferred Version: PCB 03-152,031803 PrvVar