View Properties

PCB 72-393 / PCB 72-396 / PCB 72-407 02/14/73 Opinion and Order
CITY OF EAST ST. LOUIS v. ENVIRONMENTAL PROTECTION AGENCY / VILLAGE OF SAUGET v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-37229
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, March 17, 2003 01:39:24 PM CST
Friday, May 2, 2003 03:54:24 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
February 14, 1973CITY OF EAST ST.
  • Louis which has a population of 82,000.
  • The plant also
serves a number of industries, the largest of which are manufacturingand meat packing plants.
  • They also request an
extension of the bond forfeiture date to January 25, 1973.
  • The
August sample also showed other concentrations of iron (8.4 mg/i)lead (0.1 mg/i), mercury (.007 mg/i), zinc (1.5 mg/i), ammonianitrogen (42 mg/i) and a low pH (3.5).
  • Sauget~sengineering consultant completed its Phase IIA process
design work on July 15, 1972. From investigation of those plans itappears that a delay in construction of the required facilities maywell occur.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
716460
No
Appears In: PCB 72-393 PCB 72-396 PCB 72-407
Preferred Version: PCB 72-393 / PCB 72-396 / PCB 72-407 02/14/73 Opinion and Order