serves a number of industries, the largest of which are manufacturingand meat packing plants.
They also request an
extension of the bond forfeiture date to January 25, 1973.
The
August sample also showed other concentrations of iron (8.4 mg/i)lead (0.1 mg/i), mercury (.007 mg/i), zinc (1.5 mg/i), ammonianitrogen (42 mg/i) and a low pH (3.5).
Sauget~sengineering consultant completed its Phase IIA process
design work on July 15, 1972. From investigation of those plans itappears that a delay in construction of the required facilities maywell occur.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf