  • ILLINOIS POLLUTION CONTROL BOARD
September 6, 1973ENVIRONMENTAL PROTECTION AGENCY,Complainant,v.
  • ) PCI3 72—372
FEDERAL PAPERBOARD COMPANY,Respondent.
  • The boiler operates seven days a week, twenty-four hours a day.
  • The Agency engineer used an efficiency
of 40 which had been estimated to him by Respondent’s personnelduring a visit to the plant (Statement, 6(d)).
  • This efficiency
was not based on any tests (R.
  • 31—32), it was simply an estimate. The second stack test during which coal with an ash
content of 5.08 was burned showed a measured emission rate of .5973 lbs/MBTU (Exhibit B to Statement, p. 8). Moreover, it wasthe opinion of Dr. ...
Allowed