View Properties

PCB 73-140 08/09/73 Opinion and Order
ALTON BOX BOARD COMPANY v. ENVIRONMENTAL PROTECTION AGENCY,
Handle: Document-36817
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, March 11, 2003 09:48:51 AM CST
Wednesday, May 14, 2003 03:52:45 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 9, 1973ALTON BOX BOARD COMPANY,Petitioner,vs.
  • It consumes 735 tons
of coal daily, 93 tons of processed chemicals, 600 tons of re—claimed wastepaper, 568 tons of wood chips and 8 to 10 milliongallons of water.
  • In April 1971 Petitioner hired Mid—America Engineers Incorporated
to do a feasibility study relating to the liquid wastes(Exhibit 24).
  • Although the study was to have been completed
within 8 weeks, it was not received until September 16, 1971.
  • The time schedule for the 4 stage program is as follows:
Stage 1:Install processing equipment for converting the entireoperation to reclamation of wastepaper.
  • As noted above, Stage 2...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
1792537
No
Appears In: PCB 73-140
Preferred Version: PCB 73-140 08/09/73 Opinion and Order