View Properties

P97202D.PDF
Handle: Document-3658
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 5, 2001 12:17:02 PM CDT
Thursday, April 5, 2001 12:17:02 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
May 15, 1997COMMONWEALTH EDISONCOMPANY (Zion Power Station),Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • This variance period shall commence on a date in
May 1997 when treatment of the Component Cooling Water System begins and shall continuefor 45 days, or until final treatment is completed, or upon the issuance of petitioner’s NPDESpermit, whichever occurs first.
  • The responsibilities of the
Agency and the Board in these short-term provisional variances are different from theresponsibilities in standard variances.
  • 3.
  • During the term of this provisional variance, petitioner shall limit copper from
outfall 001b to ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
P97202D.PDF
4
14803
No
Appears In: PCB 97-202
Preferred Version: P97202D.PDF