View Properties

PCB 73-562 03/07/74 Opinion and Order
MOBIL OIL CORPORATION v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-36518
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, February 28, 2003 01:21:29 PM CST
Friday, May 9, 2003 10:51:06 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 7, 1974MOBIL OIL CORPORATIONPETITIONERv.
  • ) PCB 73—562
ENVIRONMENTAL PROTECTION AGENCYRESPONDENTOPINION AND ORDER OF THE BOARD (by Mr.
  • However, no date for the placement
of the order was given.
  • The Agency has estimated that the
emissions from the tanks will total 480 tons per year, while with submerged pipe loading, the total will be reduced to 280 tons per year.
  • The Board fails to see the logic here.
  • The Board realizes the effects on the public and to Petition
er~soperators, if Mobil were forced to cease delivery of gas to the sta~tions.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
554842
No
Appears In: PCB 73-562
Preferred Version: PCB 73-562 03/07/74 Opinion and Order