| PCB 73-562 03/07/74 Opinion and Order |
| MOBIL OIL CORPORATION v. ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-36518
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Friday, February 28, 2003 01:21:29 PM CST |
| Friday, May 9, 2003 10:51:06 AM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
March 7, 1974MOBIL OIL CORPORATIONPETITIONERv.ENVIRONMENTAL PROTECTION AGENCYRESPONDENTOPINION AND ORDER OF THE BOARD (by Mr.- However, no date for the placement
of the order was given.- The Agency has estimated that the
emissions from the tanks will total 480 tons per year, while with submerged pipe loading, the total will be reduced to 280 tons per year.- The Board fails to see the logic here.
- The Board realizes the effects on the public and to Petition
er~soperators, if Mobil were forced to cease delivery of gas to the sta~tions. |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0003.pdf |
| |
| 4 |
| 554842 |
| |
| |
| No |
Appears In:
|
PCB 73-562
|
Preferred Version:
|
PCB 73-562 03/07/74 Opinion and Order
|