View Properties

PCB 73-411 01/31/74 Opinion and Order
B. I. DUPONT de NEMOURS AND COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-36365
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, February 27, 2003 08:12:57 AM CST
Friday, May 16, 2003 08:13:06 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 31, 1974) B• I.
  • DUPONT de NEMOURS AND COMPANY )
)) V.
  • ) PCB 73-411
)) ENVIRONMENTAL PROTECTION AGENCY )) MR.
  • The Agency denied the permit because in their opinion the
Prilling Tower, a portion of the plant, was not shown to be incompliance with the Air Regulations (pet.
  • They did this the Agency contends by including the
cooling and drying air flowing through the process.
  • (actually
74.7 lb./hr.) (Petition of Appeal). Based on stack tests at theplant, duPont estimates maximu...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0002.pdf
4
1370254
No
Appears In: PCB 73-411
Preferred Version: PCB 73-411 01/31/74 Opinion and Order