ordered that: “a) Petitioner shall operate only one of the twofurnaces at a time; b) one furnace shall be converted to utilize#2 fuel oil and be equipped with an afterburner by September 15,1973; c) a stack test shall be conducted on the converted furnaceby September 30, 1973; d) if the stack test proves compliancewith Rule 203(a) Petitioner shall convert the second furnace tooil firing by December 31, 1973.
Deere resubmitted
its application for permit in February 1974 arguing thatthe Agency had made an error in calculating the allowableemission rate.
If results ...