compliance, Petitioner :Ls installing a baghouse to the cycloneccllectors ata total cost of $25,000.
In granting
this Variance to Rule 203(a) the Board does so because ofthe compliance program and in recognition of the minimaladverse environmental impact during the variance period.
4. Within thirty (30) days of the final installation
of the baghouse, Petitioner shall arrange for astack test to be conducted by an independent stacktesting firm.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf