View Properties

PCB 73-452 07/25/74 Opinion and Order
MOBIL OIL CORPORATION (JOLIET REFINERY) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-35918
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, February 21, 2003 01:45:11 PM CST
Tuesday, May 13, 2003 12:45:22 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 25, 1974MOBIL OIL CORPORATION(JOLIET REFINERY)PETITIONERV.
  • ) PCB 73—452
ENVIRONMENT2~.LPROTECTION AGENCYRESPONDENT ) OPINION AND ORDER OF THE BOARD (by Mr.
  • This refinery has a
design rate of 164,000 barrels of oil per day.
  • This facility
was issued construction and operating permit #1971—EA-738 on September17, 1971, by the Agency.
  • it,
t~e pre.ert time, 80 cf tIe cyanice ~ removed from the wastewaterstream at the refinery sour water stripper.
  • can be made:
The Agency notes that from tLes~I. Recent water conservation measures by refineries ar...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
1534996
No
Appears In: PCB 73-452
Preferred Version: PCB 73-452 07/25/74 Opinion and Order