alleged that Acme caused air pollution by the operation ofits salamanders, barrel preheating process, and its wastematerial collection.
On the basis of problems which it incurred in acquiring
the necessary steel and other equipment, Acme asked anextension of six months during which time it would fabricatethe necessary equipment and materials.
Acme claims that it has expended every effort
during the period of the original variance to control thepossibilities of open burning and the resultant emission ofpollutants.
The Agency inspector felt that
the concrete pit installed’by Acm...