  • ILLINOIS POLLUTION CONTROL BOARD
December 19, 1974ABBOTT LABORATORIESPETITIONERv.
  • ) PCB 74—338
ENVIRONMENTAL PROTECTION AGENCY ) RESPONDENTMR.
  • Hearing was held in North Chicago, Lake County, Illinois, on Octo-
ber 31, 1974.
  • Pilot plant work
was done to determine how this could be done.
  • The Board agrees and notes that even if Abbott
were to start work today to upgrade the plant, it probably would not bein operation by the time the Gurnee plant was ready to receive the eff—luent.
  • Abbott states that though the
plant average over 26 months was 17/25 BOD/SS, there were days when theeffluent was higher and days when it was lower...