  • ILLINOIS POLLUTION CONTROL BOARD
May 8, 1975MT.
  • For purposes of brevity the reader is referred
to our Opinion in PCB 74-280, 14 PCB 211 for a summary ofthese actions.
  • Segments of this interconnection have been constructed and
completed.
  • Mt.
  • Carmel expects to complete construction by
December 31, 1975.
  • 1, the Agency has recommended denial of the
variance on the ground that the boiler can now operate oniueL oil.