View Properties

PCB 74-275 10/31/74 Opinion
SHERWIN-WILLIAMS COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-35539
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, February 14, 2003 09:45:04 AM CST
Wednesday, April 23, 2003 02:03:36 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 31, 1974SHERWIN-WILLIAMS COMPANYv.
  • PCB 74-275
)) ENVIRONMENTAL PROTECTION AGENCY )) OPINION OP THE BOARD (by Mr.
  • The variance requested was twofold: to change the
date for completion of a heavy metal control system fromSeptember 30, 1974 as set in PCB 73-367 to December 15, 1974 or2-1/2 months after.a concrete truck drivers strike ends,whichever is later; and, a further extension, until November 6,1975, of a variance from Rule 702 of the Water Pollution Regulations to disch~rgenot more than 5 lbs.
  • The
Agency recommended 4.0 lbs.
  • of mercury to be discharged (on an
annu...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
428828
No
Appears In: PCB 74-275
Preferred Version: PCB 74-275 10/31/74 Opinion