  • ILLINOIS POLLUTION CONTROL BOARD
April 10, 1975CITY OF BREESE, Petitioner,v.
  • ) PCB 73—209
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • The remaining 2,750 kw are supplied by
two coal-fired boilers, which are the subject of this variancepetition.
  • Anticipated peak loads through 1980 were
estimated between 6,900 and 8,900 kw.
  • It felt that retirement of
Boiler No.
  • 1 was contingent on the completion of the new
diesel generator, on locating adequate supplies of dieselfuel oil and on the maintenance of a reserve generatingcapacity adequate to protect against forced outages. We cannot grant variances oncontingent possibilities. Moreover, we find th...