View Properties

P97171D.PDF
Handle: Document-3524
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 5, 2001 12:03:41 PM CDT
Thursday, April 5, 2001 12:03:41 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 3, 1997CITY OF KEWANEE,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code 305.102(b) and 309.146(a)(4) and the NPDES effluent discharge requirements, as
set forth in 304.141(b).
  • This variance period shall commence during the first excess flow
discharge event through Outfall 003 due to the rupture of the berm and continue until theconstruction of the 16 MG excess flow equalization lagoon is complete, but not longer than 45days.
  • The responsibilities of the
Agency and the Board in these short-term provisional variances are different from theresponsibilities in standard variances. 3. During the term of th...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
P97171D.PDF
4
9720
No
Appears In: PCB 97-171
Preferred Version: P97171D.PDF