View Properties

PCB 75-415 10/30/75 Interim Order
DEL MONTE CORPORATION v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-34611
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, February 3, 2003 04:17:29 PM CST
Friday, April 25, 2003 12:11:56 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 30, 1975DEL MONTE CORPO~TION, ) Petitioner,V.
  • ) PCB 75—415
ENVIRONMENTAL PROTECTION )/ IRespondent.
  • 1975.
  • That section of the Petition seeking
relief from the organic material emission standards issnadequate sri light of Train v.
  • N.R.D.C., 43 U.S.L.W.
  • 4467
(U~S.• April 16, 1975) ~ThT~erequires that,before a Variance may be gran~ed7it must be shown that suchqrant wIll not interfere with the attainment or maintenanceof tao National Ambient Air Quality Standards. a~EPA, PCB 75—159 (April 24, 1975) (~erim Order of th~~i~j~ Great Lakes Carbon Corp. Failure to timely ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
173753
No
Appears In: PCB 75-415
Preferred Version: PCB 75-415 10/30/75 Interim Order