View Properties

PCB 75-386 03/11/76 Opinion and Order
ENVIRONMENTAL PROTECTION AGENCY v. FRANKLIN ELEVATOR, INC.
Handle: Document-34526
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, February 3, 2003 01:34:46 PM CST
Tuesday, May 27, 2003 08:34:40 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 11, 1976ENVIRONMENTAL PROTECTION AGENCY, ) Complainant,v.
  • ) PCB 75—386
FRANKLIN ELEVATOR, INC., ) Respondent.
  • (Respondent) on October 8, 1975.
  • The
Agency alleged that Respondent runs an elevator operation forhandling and drying grain and that Respondent did run its graindryers during grain drying season since September 1, 1972, including but not limited to October 16, 1974 and February 14, 1975,so as to cause or allow emission of fugitive particulate mattervisible by an observer looking generally toward the zenith at apoint beyond the property line of the emission source, in violationof Rule 102 a...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
642309
No
Appears In: PCB 75-386
Preferred Version: PCB 75-386 03/11/76 Opinion and Order