Board Order in PCB 74-492 indicated that Olin was reviewing othercompliance methods in addition to the filtration equipment and theBoard agreed to allow Olin to propose installation of such alternateequipment so long as it was operative by March 1, 1976.
21—367
—2—The Board will therefore grant Olin a variance from Rule 408(a)of the Board’s Water Regulations with respect to suspended solidsfrom March 1, 1976 to January 1, 1977 for Olin’s Blockson Worksclarifier system.
ORDER
It is the Order of the ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf