| PCB 76-101 06/18/76 Opinion and Order |
| VILLAGE OF TOWER HILL v. ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-33987
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Monday, January 27, 2003 01:19:46 PM CST |
| Tuesday, May 27, 2003 12:49:24 PM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
June 18, 1976VILLAGE OF TOWER HILL,Petitioner,v.ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.- The Village is presently awaiting Agency approval
of its Step I Facilities Plan for the construction of a sanitarysewage system and waste treatment facilities.- The Village has also considered two other alternatives to
phosphorus removal.- In the USEPA National Eutrophication
Survey Report on Carlyle Reservoir an annual total phosphorusloading of 698,050 lbs/year to Carlyle Reservoir is estimated.- The Board will require, however, that the Village
design and construct the sewage treatment plant to allow for the... |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0002.pdf |
| |
| 4 |
| 740348 |
| |
| |
| No |
Appears In:
|
PCB 76-101
|
Preferred Version:
|
PCB 76-101 06/18/76 Opinion and Order
|