View Properties

PCB 75-355 11/10/76 Opinion and Order
WOODRUFF & EDWARDS, INC. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33846
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, January 24, 2003 02:22:11 PM CST
Wednesday, April 30, 2003 11:22:55 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS PJ3LLUTION CONTROL BOARD
November 10, 1976WOODRUFF & EDWARDS, INC.,Petitioner,v.
  • ) PCB 75—355
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • Woodruff subsequently filed two
amended petitions, the last of which includes installation of theafter-burner system as part of the compliance program.
  • The
Board finds it would be an arbitrary and unreasonable hardship todeny Woodruff variance just as it is about to achieve compliance withthe Regulations after having conducted a long-term experiment which,although a failure, had been ratified by the Board in a previousvariance case.
  • (d) Within 90 days of the completion of installation of
the control equipment, Woodruff sh...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
621949
No
Appears In: PCB 75-355
Preferred Version: PCB 75-355 11/10/76 Opinion and Order