PCB 76-032 08/05/76 Opinion and Order
LEONARD C. TRIEM, d/b/a TRIEM INDUSTRIAL BUILDING OPERATIONS v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33723
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, January 23, 2003 02:12:27 PM CST
Wednesday, May 28, 2003 11:49:54 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 5, 1976LEONARD C.
  • TRIEM, d/b/a TRIEM
INDUSTRIAL BUIlDING OPERATIONS,Petitioner,v.
  • ) PCB 76—32
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • Now 95
full, operations on the site are confined to a trench 30 feet deepand measuring 100 feet by 600 feet.
  • Triem will also install additional methane burners to complement
the existing one.
  • The Amended Petition shows that Petitioner’s site was operated as
an open dump for many years before acquisition by Petitioner, resultingin a great need for cover material. PCB 76-32, understand and accept said Order,realizing that such acceptance renders all terms andconditions thereto binding a...