View Properties

PCB 76-178 07/08/76 Order
S & S DEVELOPMENT v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33642
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, January 23, 2003 10:21:32 AM CST
Wednesday, May 28, 2003 10:53:18 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 8, 1976S & S DEVELOPMENT,Petitioner,v.
  • ) PCB 76—178
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • The petition is inadequate in that it fails to
comply with the requirements of our Procedural Rule 401.
  • Petitioner is directed
to supply information, including, but not limited to the followingdata: the average dry weather flow of the treatment plant; thedesigned dry weather flow of the treatment plant; the maximum hydraulic capacity of the treatment plant; the BOD and suspendedsolids concentration of the effluent and of the receiving stream;the design and construction grant status of the treatment plantimprovements; and the esti...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
179791
No
Appears In: PCB 76-178
Preferred Version: PCB 76-178 07/08/76 Order