  • ILLINOIS POLLUTION CONTROL BOARD
December 16, 1999COMMONWEALTH EDISONCOMPANY (Zion Power Station),Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code
309.154(a), (b).
  • The Agency recommends that the Board grant the requested provisional variance with specified
conditions.
  • Adm. Code 309.154(a), (b), which prohibits the
construction of any new treatment works, disposal well, or wastewater source without an NPDESPermit. The term of this provisional variance shall commenceupon the start of testing which is scheduled to begin in the middle of December 1999and continue for a period of 21 days. Illinois Supreme Court Rule 335 establishes such filing ...
Allowed
wilsonb
Adobe Portable Document Format (.pdf) - application/pdf
00-099121699.PDF
4
11093
No
Appears In: PCB 00-099
Preferred Version: PCB 00-099 12/16/99 Order