| - ILLINOIS POLLUTION CONTROL BOARD
August 18, 1977CANNON CONSTRUCTION COMPANY,Petitioner,V.ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.- The variance request was to allow Petitioner to continue
to operate its refuse disposal site located northeast ofQuincy, Illinois, without first obtaining a permit from theAgency.- The majority of the profitable
work is done during the spring and summer months, the periodfor which the variance is sought.- 2.
- Possibility of no work through peak season and
consequent possible foreclosure of land contracts. 6, 7). Based on t~’is ren~:t tt~ pa t e~ac’uee ~hat the potential for water poi~ticn ~s ~rnrr~P... |
| Allowed |
| |
|