View Properties

PCB 76-246 06/28/77 Opinion and Order
REVERE COPPER AND BRASS, INC. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33062
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, January 15, 2003 12:06:14 PM CST
Friday, May 9, 2003 04:11:36 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 28, 1977REVERE COPPER AND BRASS, INC., ) Petitioner,v.
  • ) PCB 76—246
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • The Tube Mill Plant produces the
seamless copper tubing and the Manufacturing Plant producesthe stainless steel utensils and the fabricated metal products.
  • The present effluent from the ponds consists of
569,600 gpd of water containing 0.57 ppm ~2.7l lbs/day) suspended copper and 0.81 ppm (3.85 lbs/day) dissolved copper(Pet.
  • “ReverE.
  • Ditch” carries the overflow from the aforementioned
ponds for a distance of several thousand feet anddischarges into Coon Creek. Estimated costs:$1,965,600 capital; $106,000...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1703676
No
Appears In: PCB 76-246
Preferred Version: PCB 76-246 06/28/77 Opinion and Order