View Properties

R 77-017 12/08/77 Order
IN THE MATTER OF: WATER POLLUTION CONTROL REGULATIONS AMENDMENTS: COOLING LAKES
Handle: Document-32992
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, January 14, 2003 11:41:23 AM CST
Monday, May 12, 2003 04:05:54 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • IN THE MATTER OF:
UTTON CONTROL BOA’ ~) ~mher 8, 1977WATER POLLUTION CONTROLREGULATIONS AMENDMENTS: L(,OL~NCLAKESORDER OF THE BOARD ~ T~j~ GoodnIn conformity with R’iles 20.
  • STATEMENT OF NEED
On August 14, 1975, the Board entered its final Order inregulatory proceeding R75-2, ç~li~~’.
  • The purpose of that
Regulation was, in brief, to provide relief from the generallyapplicable thermal limitations of Chapter 3 for certain coolingwater impoundments constructed and/or used by the electric powergeneration industry, without compromising the environmental qualityof protected waters of the state.
  • Id., 18 PCB at 684.
  • However, on Novemb...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
507385
No
Appears In: R 77-017
Preferred Version: R 77-017 12/08/77 Order