UTTON CONTROL BOA’ ~) ~mher 8, 1977WATER POLLUTION CONTROLREGULATIONS AMENDMENTS: L(,OL~NCLAKESORDER OF THE BOARD ~ T~j~ GoodnIn conformity with R’iles 20.
STATEMENT OF NEED
On August 14, 1975, the Board entered its final Order inregulatory proceeding R75-2, ç~li~~’.
The purpose of that
Regulation was, in brief, to provide relief from the generallyapplicable thermal limitations of Chapter 3 for certain coolingwater impoundments constructed and/or used by the electric powergeneration industry, without compromising the environmental qualityof protected waters of the state.
Id., 18 PCB at 684.
However, on Novemb...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf