View Properties

R 75-005 / R 74-002 05/25/78 Order
IN THE MATTER OF: PROPOSED AMENDMENTS TO CHAPTER 2, PART II, SULFUR DIOXIDE EMISSIONS
Handle: Document-32461
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, January 7, 2003 02:14:41 PM CST
Wednesday, May 28, 2003 04:13:05 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
May 25, 1978IN THE MATTER OF: R75—5PROPOSED AMENDMENTS TO CHAPTER ) R74-22, PART II, SULFUR DIOXIDEEMISSIONSORDER OF THE BOARD (by Mr.
  • Hence, a new standard of 6.8 ibs./MMBTU is proposed.
  • The 204(e) (1) formula represents the state of the art
and is generally an improvement over the existing Rule 204(e)formula.
  • This definition of input parameters would take into account
normal variations in sulfur content of fuel, the use of pollutioncontrol equipment, and boiler firing capacity.
  • Hence, the Aqeh~yamended its proposal to
provide a means by which a source could obtain an emission limitation based on the specific charact...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
1103526
No
Appears In: R 74-002 R 75-005
Preferred Version: R 75-005 / R 74-002 05/25/78 Order