of this variance is both the coking operation and the basic oxygenfurnace operation at the plant.
‘In the case of the warped hood plates, the emissions
escape through the ventilating monitor located in the roof of thebuilding.
The
Agency recommendation conditions are almost identical to the pro~posed compliance plan included in WSC’s Petition with minorexceptions that require Petitioner to obtain necessary State construction and operating permits, to achieve compliance with Rule203 (d) (6) (13) (Iv) (nn) no J.aL...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf