  • ILLINOIS POLLUTION CONTROL BOARD
February 15, 1979ILLINOIS POWER COMPANY, ) Petitioner,v.
  • ) PCB 79-7
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • What the Board must do in this proceeding, however, is
in essence to make a finding that a breach of the air qualitystandards will not ever occur under foreseeable meteorologicalconditions.
  • The fact that the modelled
concentrations were lower than the monitored concentrationspoints out the need to take background concentrations and a moresite specific plume—rise equation into account when determiningif a power plant such as Baldwin will violate air quality standards or PSD increments.
  • 32—569
—...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
360074
No
Appears In: PCB 79-007
Preferred Version: PCB 79-007 02/15/79 Dumelle Concurring Opinion