January 4 , 1979ENVIRONMENTAL PROTECTION AGENCY,Complainant,V.
) PCB 78—43
DALE F.
STRALEY, )
Respondent,MR.
The dryer operates from 6:00 a.m.
to 10:00
p.m.
and the aeration fans may run for 24—hour periods or longer. Between June 9, 1977 and October 13, 1977 Respondent installed
plywood baffles near the grain dryer and around the gear box. All modificationsmust meet certain specifications and requirements. The Agencywill test the results of the modifications and further workmay be required. 2. Respondent shall comply with all the stipulated settlement incorporated by reference as if completely setforth herein...