View Properties

PCB 78-101 11/16/78 Opinion and Order
CENTRAL ILLINOIS PUBLIC SERVICE COMPANY (MEREDOSIA POWER STATION) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31948
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, December 30, 2002 12:01:54 PM CST
Friday, May 30, 2003 09:26:00 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 16, 1978CENTRAL ILLINOIS PUBLIC SERVICECOMPANY (MEREDOSIA POWER STATION),Petitioner,v.
  • ) PCB 78—101
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • However, at the hearing a memo
representing the Agency’s view point was introduced and enteredas an exhibit (Resp.
  • lA).
  • The temperature rise across the condensers
varies with plant generation (and resultant heat rejection) andthe number of circulating water pumps in operation.
  • Typical conditions for the winter, spring and
summer seasons produce only minimal changes in temperature(Ex. The study further concludes that field studies of the riverecology for the period 1971—...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
772868
No
Appears In: PCB 78-101
Preferred Version: PCB 78-101 11/16/78 Opinion and Order