November 16 , 1978E~NVIRONMENTAL PROTECTION AGENCY,Complainant, PCB 77—24J.
ROYDEN PEABODY, JR., D.
IRVING
LONG and JANE PEABODY DURHAM,Respondents.
No
testimony was given.
The stipulation provides the following facts.
Run-off from these gob piles flows into Grape Creek causing
or contributing to the water quality violations found inGrape Creek. Respondents have retainedthe firm of M & E/Alstot, March and Guillou, Inc. With the mine not in operation thereis no social value to it and the economic value is greatlyreduced.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf