  • ILLINOIS POLLUTION CONTROL BOARD
November 2, 1978ELECTRIC ENERGY, INC.,Petitioner,v.
  • ) PCB 78—227
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • In a prior variance proceeding, PCB 75-106, the Board
granted EEl a variance from Rule 204(e) of Chapter 2: Air Pollution Regulations, for the Joppa Station.
  • The contractor has adopted an expanded
work schedule, but even with this schedule it appears that allof the stacks will not be connected to the generating units untilNovember 5.
  • EEl indicates that, based upon experience to date
and the tightness of the schedule, several more weeks’ delay mayoccur.
  • The two month variance sought herein is
reasonable....
Allowed