May 10, 1979IN THE MATTER OF:LAKE MICHIGAN PERMIT FOR ) PCB 78—114WAUKEGAN PORT DISTRICTOPINION OF THE BOARD (by Mr.April 27, 1978 the Board authorized the Chairman to sign thepermit.the Board~sOrder dated February 15, 1979.- Any dredging project, by its very nature, causes the suspension
of particles in the water, which will migrate and eventuallybe deposited someplace else.- The Board will use that authority here to determine
whether the District will cause water pollution as that termis defined in Section 3(n) of the Environmental ProtectionAct. |