| PCB 78-088 / PCB 78-225 09/20/79 Satchell Dissenting Opinion |
| ENVIRONMENTAL PROTECTION AGENCY v. SUNDALE SEWER CORPORATION, an Illinois corporation |
| |
| |
Handle:
|
Document-31774
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Friday, December 27, 2002 11:58:31 AM CST |
| Monday, June 2, 2003 02:41:56 PM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
September 20, 1979ENVIRONMENTAL PROTECTION AGENCY, ) Complainant, PCB 78—88 andv.) ConsolidatedSUNDALE SEWER CORPORATION, anIllinois corporation,Respondent.- The stipulation should provide adequate mechanisms: (1) to
determine when a breach of condition has occurred and (2) toprovide relief in the unforeseen event of impossibility in meetingthe conditions.- The contingent or suspended penalty represents another option in
negotiating settlements.Christan L.Illinois Polluti ontrol Board |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0005.pdf |
| |
| 4 |
| 209161 |
| |
| |
| No |
Appears In:
|
PCB 78-088
,
PCB 78-225
|
Preferred Version:
|
PCB 78-088 / PCB 78-225 09/20/79 Satchell Dissenting Opinion
|