| PCB 79-012 03/15/79 Opinion |
| SOUTHWESTERN ILLINOIS COAL CORP. v. ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-31741
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Friday, December 27, 2002 10:07:53 AM CST |
| Wednesday, June 11, 2003 12:07:42 PM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
March 15, 1979SOUTHWESTERN ILLINOIS COAL CORP.,Petitioner,v, ) PCB 79—12ENVIRONMENTAL PROTECTION AGENCY,Respondent.reclaimed under the provisions of the Illinois and FederalReclamation laws.- Discharges will flow through sedimentation
ponds.- Although these ponds do not reduce levels of total
dissolved solids and sulfates, they at least allow for a controlledvolume of discharge during dry weather and periods of lightprecipitation.- The Agency has indicated that Petitioner’s NPDES permits
authorize three discharges and that Petitioner is presentlyreporting five.- The interim effluent limitati...
|
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0001.pdf |
| |
| 4 |
| 675094 |
| |
| |
| No |
Appears In:
|
PCB 79-012
|
Preferred Version:
|
PCB 79-012 03/15/79 Opinion
|