View Properties

PCB 78-029 03/15/79 Opinion and Order
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY v. I.D. CANNON d/b/a CANNON CONSTRUCTION COMPANY
Handle: Document-31733
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, December 27, 2002 09:57:08 AM CST
Wednesday, June 11, 2003 12:06:06 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 15, 1979ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Complainant,v.
  • ) PCB 78-29
I.
  • D.
  • CANNON, d/b/a
CANNON CONSTRUCTION COMPANY,Respondent.
  • A hearing was held on August 7, 1978.
  • The Respondent operated a solid waste management site in
Adams County, Illinois on which demolition wastes such as brick,lumber and concrete were &posited. Hetestified that he operates the Cannon Construction Company with twoother partners and is engaged in the demolition of existingstructures in the Quincy area. (R. 19-26). The Respondentstated that the cost of placing final completion cover on his site,as estimated by the last engineer he talked to...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
811311
No
Appears In: PCB 78-029
Preferred Version: PCB 78-029 03/15/79 Opinion and Order