View Properties

PCB 79-139 07/26/79 Order
IN THE MATTER OF: LAKE MICHIGAN PERMIT #072LM FOR ROBERT P. CAVALLINO
Handle: Document-31673
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, December 24, 2002 02:38:32 PM CST
Monday, June 2, 2003 01:50:54 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 26, 1979IN THE MATTER OF: PCB 79—139LAKE MICHIGAN PERMIT #072LM FOR ) ROBERT P.
  • CAVALLINO
ORDER OF THE BOARD (by Mr.
  • Dumelle):
On July 9, 1979 the Illinois Department of Transportationrequested Board concurrence in a permit to authorize the in—stallation of a 121 foot permeable offshore break~iater.
  • The
Chairman is hereby authorized to sign the permit on behalf ofthe Board.
  • IT tS SO ORDERED.
  • I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify the above Order was adopted onthe )~ day of ~ ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0005.pdf
4
97400
No
Appears In: PCB 79-139
Preferred Version: PCB 79-139 07/26/79 Order