View Properties

PCB 78-153 06/22/79 Opinion and Order
ENVIRONMENTAL PROTECTION AGENCY v. JACK CARLSTROM, d/b/a LOCKPORT TRUCKING COMPANY
Handle: Document-31622
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, December 23, 2002 02:27:22 PM CST
Tuesday, August 17, 2004 03:38:50 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 22, 1979ENVIRONMENTAL PROTECTION AGENCY, ) Complainant,v.
  • ) PCB 78—153
JACK CARLSTROM, d/b/a LOCKPORT ) TRUCKING COMPANY, ) Respondent.
  • IV Section 21(b) Failed to place compacted layer of
Rule 305(b) twelve inches of suitable materialon all surfaces of the site whereno additional refuse will bedeposited within sixty days.
  • 608).
  • Four storm tiles were laid to carry runoff from an 1—80 interchange
area into the quarry (R.
  • 616, 618, 666),
The site as it now exists has a wall of exposed rock whichappears to be about thirty feet high on...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 78-153 06_22_79 Opinion and Order.pdf
4
2767566
No
Appears In: PCB 78-153
Preferred Version: PCB 78-153 06/22/79 Opinion and Order