View Properties

PCB 80-223 02/19/81 Opinion and Order
CITY OF ASSUMPTION V. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31589
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, December 20, 2002 11:11:36 AM CST
Tuesday, June 3, 2003 02:09:33 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
February 19, 1981CITY OF ASSUMPTION, ) Petitioner, PCB 80—223ILLINOIS ENVIRONMENTALpf)rfl~c9~()!~ AGENCY,Respondent.
  • The plant wa~designed
to receive and treat 0.18 million gallons per day (MGD) withan organic population equal to 1,800 population equivalent(P,~Ej.
  • An 18—inch
and a 15-inch drainage field tile which collect run—off fromadjacent farms are also connected to the system and add 0.125MCD of inflow, As part of the sewage system upgrading, thesefield tile will be disconnected, but no timetable is given fordisconnection.
  • Further, it is unclear
whether the proposed improvements will remedy the problemof basement flo...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0009.pdf
4
479429
No
Appears In: PCB 80-223
Preferred Version: PCB 80-223 02/19/81 Opinion and Order