December 4, 1980CENTRAL ILLINOIS PUBLIC SERVICE COMPANY,(Meredosia Power Station), ) Petitioner,v.
) PCB 80—187
ENVIRON~NTAL PROTECTION AGENCY, ) Resoondent.
CIPS
will haul by tanker truck the spent EDTA solution, containing mostof the metal wastes~ for treatment away from the site.
40-~75
The boiler cleaning was originally scheduled to last a twoweek period from August 30 to September 13.
2.
This variance shall apply only to discharge to the ash
pond of boiler cleaning rinse water resulting from asingle boiler cleaning operation. The formof the Certificate shall be as follows:CERTIFICATIONI, (We), ...