View Properties

PCB 80-187 12/04/80 Opinion and Order
CENTRAL ILLINOIS PUBLIC SERVICE COMPANY (Meredosia Power Station) V. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31386
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, December 18, 2002 03:12:41 PM CST
Friday, May 30, 2003 03:10:51 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 4, 1980CENTRAL ILLINOIS PUBLIC SERVICE COMPANY,(Meredosia Power Station), ) Petitioner,v.
  • ) PCB 80—187
ENVIRON~NTAL PROTECTION AGENCY, ) Resoondent.
  • CIPS
will haul by tanker truck the spent EDTA solution, containing mostof the metal wastes~ for treatment away from the site.
  • 40-~75
The boiler cleaning was originally scheduled to last a twoweek period from August 30 to September 13.
  • 2.
  • This variance shall apply only to discharge to the ash
pond of boiler cleaning rinse water resulting from asingle boiler cleaning operation. The formof the Certificate shall be as follows:CERTIFICATIONI, (We), ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0009.pdf
4
584519
No
Appears In: PCB 80-187
Preferred Version: PCB 80-187 12/04/80 Opinion and Order